Matt Dalley Demolition

PROJECTS

Martin-Pl
Martin-Pl-3

MARTIN PLACE

  • Concrete cutting.
  • Temporary propping.
  • Demolition to create an atrium through 14 storeys.
matt-dailey-logo-web150
Walsh-Bay-(1)
Walsh-Bay-3

WALSH BAY

  • Commercial strip out of a heritage building and theatre back to base structure.
  • Friable and non- friable asbestos removal and remediation.
  • Structural alteration of timber structure to remove roof elements and create penetrations.
matt-dailey-logo-web150
campbell-stores-3
campbell-stores-1

CAMPBELL STORES

  • Demolition whilst working within a heritage structure.
  • Asbestos Removal.
  • Demolition of Campbell Steps in public domain.
matt-dailey-logo-web150
Tamarama
Tamarama-(1)

TAMARAMA

  • Demolition of concrete balconies to an 8 storey structure.
  • Demolition of Lift cores and Stair Enclosures.
  • Robotic Demolition.
matt-dailey-logo-web150
570-George-Street-2
570-George-Street

570 GEORGE STREET

  • Decommissioning and demolition of AHU Plant rooms, risers and services.
  • Asbestos Removal.
  • Creation of service riser penetrations throughout structure.
matt-dailey-logo-web150
Emerton-(1)
Emerton

EMERTON SHOPPING CENTRE

  • Demolition of a Shopping Centre.
  • Asbestos Removal.
  • Structural steel demolition and roof removal.
matt-dailey-logo-web150
MD_port_kembla
MD_port_kembla_a

PORT KEMBLA

  • Asbestos Roof Removal.
  • Full Demolition of 20,000sqm of warehouses.
  • Site Clearance.
matt-dailey-logo-web150
concord_1
concord2

CONCORD HOSPITAL

  • Asbestos and lead paint Removal.
  • Remediation of soils.
  • Demolition of Hospital Buildings.
matt-dailey-logo-web150

SUMMER HILL SILOS

  • Concrete Cutting to create façade penetrations over 14 storey grain silos.
  • Demolition of Heritage Building back to main structure.
  • Plant and Services strip out of heritage building.
matt-dailey-logo-web150
Lincoln-Building-(1)
Lincoln-Building

LINCOLN BUILDING MACQUARIE UNIVERSITY

  • Façade Demolition.
  • Commercial building strip out.
  • Asbestos Vinyl and Adhesive removal.
matt-dailey-logo-web150
Epping-(1)
Epping

EPPING

  • Full Demolition of 6 Storey Building.
  • Asbestos Removal.
  • Interior strip out.
matt-dailey-logo-web150